ENGLISH     DEUTSCH     РУССКИЙ     PHOTOS
News  |  Guest book  |  Site map  | 
 Search: 
The metro bridge
In Omsk Metro bridge, which was being built during 12 years, was finally set in operation in 2007.

It connects historical and busy center on the right bank of Irtish with huge housing blocks on the left one ( where the new center is also under construction). The Metrobridge reaches 648 meters in length and 32 meters in width and it’s the part of the future Omsk subway. The first subway line will pass it. There are also 6 traffic lanes on the Metrobridge.

The building of the bridge started in 1993, but in 1994 practically all the work was interrupted because of the stopping of federal financing. In 2001 the building of the bridge recommenced.
ENGLISH  |  DEUTSCH  |  РУССКИЙ  |  PHOTOS  |  Щ top